lower prospect canal reserve |
previous | next | | close this tab/window to return |
photos - cycleway construction |
Drainage for the filled canal was achieved by placing agricultural pipe in the base of the canal and connecting it back to the drainage outlets. |
previous | next | | close this tab/window to return |